The Lean Six Sigma Tools Memory Jogger

Please sign in to see more chapters

Table of Contents

How to Use Memory Joggers  Free Sample
IASSC Body of Knowledge
1. Affinity Diagram
2. Analytical Hierarchy Process
3. Batch Size Reduction
4. Binary Logistic Regression
5. Boxplot
6. Cause and Effect/Fishbone Diagram
7. Central Limit Theorem
8. Change Management
9. Communication Management
10. Confidence Intervals  Free Sample
11. Control Charts
12. Control Charts: Exponentially Weighted Moving Average (EWMA)
13. Control Charts: Laney P' and U'
14. Control Charts: Non-normal Data with Continuous Control Charts
15. Control Charts: Rare Events
16. Control Charts: Z-mR Short Run
17. Control Plan
18. Correlation
19. Cost of Poor Quality
20. Critical To Flowdown
21. Dashboard Metrics
22. Data Collection Plan
23. Defects Per Million Opportunities (DPMO)
24. Design for Lean Six Sigma (DFLSS)
25. Design of Experiments
26. DMAIC Model and Six Sigma
27. Dot Plot
28. Fault Tree Analysis
29. 5S
30. 5 Whys
31. Failure Mode and Effects Analysis
32. Graphical Analysis
33. Graphical Summary
34. Histograms
35. History and Focus of Lean and Six Sigma (LSS)
36. Hypothesis Testing
37. Hypothesis Testing: Non-Parametric
38. Individual Value Plot
39. Is-Is Not Analysis
40. Kaizen Events and Quick Wins
41. Kano Analysis
42. Lean Six Sigma Deployment
43. Lessons Learned
44. Managing Constraints and Pacemakers  Free Sample
45. Measurement Systems Analysis
46. Measures of Central Tendency
47. Measures of Spread
48. Mistake Proofing
49. Multi-Vari Charts
50. Multi-Voting
51. Nominal Group Technique (NGT)
52. Normal Distribution Properties
53. Normal Probability Plot
54. One-Piece Flow  Free Sample
55. Pareto Chart
56. Phase (Tollgate) Reviews
57. Piloting Solutions
58. Point of Use Storage (POUS)
59. Population vs. Sample
60. Portable Equipment
61. Probability and Distributions
62. Process Capability
63. Process Capability: Non-normal Data in Continuous Capability Studies
64. Process Capability: Other Situations
65. Process Equations
66. Process Mapping
67. Process Mapping: Swim Lane
68. Process Mapping: Top-Down
69. Production Leveling (Heijunka)
70. Project Benefit Assessment
71. Project Charter
72. Project Close Out
73. Project Closure
74. Project Execution and Monitoring
75. Project Identification and Selection
76. Project Management
77. Project Plan
78. Project Team Management
79. Pugh Matrix
80. Pull Systems
81. Quick Changeover
82. RACI Matrix (Accountability Diagram)
83. Regression
84. Replication Opportunities
85. Risk Assessment and Management
86. Roles and Responsibilities
87. Rolled Throughput Yield
88. Sample Size
89. Sampling Strategies
90. Scatter Diagram
91. Short-Term vs. Long-Term Variation
92. Sigma Values
93. SIPOC
94. Solution Selection
95. Spaghetti Diagram
96. Stakeholder Management
97. Standard Work and Work Instructions
98. Statistics and Variation
99. Sustaining Change
100. Time Series Plot (Run Chart)
101. Total Productive Maintenance
102. Training
103. Transforming Data
104. Tree Diagram
105. Validating and Verifying Improvements
106. Value Analysis and Waste Identification
107. Value Stream Map (VSM)
108. Visual Controls (Visual Management)
109. Voice of the Customer
110. Work Layout (Cellular Design)
111. Workload Balance
112. Acronyms